>> GASUNIE
From Paper to a Digital Future
Successful Implementation of Digital Pipe Book Data Management at Gasunie Deutschland
>> GASUNIE
From Paper to a Digital Future
Successful Implementation of Digital Pipe Book Data Management at Gasunie Deutschland
>> GASUNIE Deutschland
Gasunie Deutschland GmbH & Co. KG is one of Germany’s leading gas transmission system operators and is headquartered in Hanover. The company operates an extensive gas transmission network spanning approximately 4,700 kilometers, making an important contribution to ensuring a secure energy supply.
At the same time, Gasunie Deutschland is actively shaping the development of a future hydrogen infrastructure and continuously advancing the digitalization of technical processes and documentation. A key element of this transformation is the digital capture, management, and provision of technical pipe book data.
Digitalization of the
Pipe Book Data Management
Technical documentation and pipe book data provide an essential foundation for the safe, efficient, and sustainable operation of gas transmission networks.
Before the introduction of the Pipe Book Data Management (RBDM) software, pipe book data was primarily recorded manually on paper and subsequently transferred to Excel files. During the construction phase, relevant information was stored across various documents and systems in a decentralized manner. This resulted in significant administrative effort, disruptions in data workflows, and limited traceability. Upon completion of construction work, technical documentation was predominantly archived in paper form.
The introduction of digital Pipe Book Data Management fundamentally modernized this process. Pipe book data can now be captured digitally directly on-site, stored centrally, and processed in a fully traceable manner through to the final pipe book documentation.
Key improvements include:
Digital Pipe Book Data Management thus provides a central foundation for more efficient processes, improved data quality, and modern digital technical documentation.
“The decision to appoint an external project manager was a key success factor. While our internal departments could only support the project alongside their day-to-day responsibilities, HoPM ensured the necessary structure, accountability, and continuous project oversight. This enabled us to drive the project forward in a focused manner and bring it to a successful conclusion.”
Thomas Winkelmann, PO Team Digital Asset Operations
Our contribution
House of PM took over project management and was responsible for planning, managing, and coordinating the project through to its successful completion.
A key challenge was to align the existing governance, planning, and approval processes of a large infrastructure company with the requirements of an iterative software implementation.
A hybrid project management approach based on the Waterfall-Scrum principle was used for this purpose. Traditional project management methods provided clear structures, defined milestones, reliable planning, and transparent decision-making processes. At the same time, agile approaches made it possible to implement requirements iteratively, review results at an early stage, and incorporate new insights directly into the subsequent implementation.
This combination made it possible to comply with the company’s internal governance and approval processes while at the same time providing the flexibility required for a practical software implementation in a technical environment.
This created the necessary balance between planning certainty, transparency, flexibility, and iterative implementation.
The successful implementation of digital pipe book data management demonstrates how professional project management in digitalization projects in the energy and infrastructure sector can contribute to the sustainable modernization of complex technical processes.
Contact
>> Contact
Digital Dialog
Are you interested in more detailed information on project success?
Simply book an appointment for a digital dialog with us.